Terrace Bridge
Terrace Bridge at Aspire
I was the project manager and design manager from client side to ensure smooth construction as the main challenge is cutting the hill (berm) of running track and construct a temporary jogging track. Also, the design sequences, site controls, finishing materials, progress monitoring, and connection with the existing building were challenges solved in this unique project.
Moreover, I had modified the design structurally in order to ensure optimum output in terms of stability and materials consumptions